What to Prepare Before Ferris Wheel Installation
Gather the site plan, check the delivery route and agree on responsibilities with your supplier before you schedule installation.
Compare rides, plan your site and prepare for opening day.
Browse articlesGather the site plan, check the delivery route and agree on responsibilities with your supplier before you schedule installation.
Can’t find your answer?Ask our team
Start with the model drawing. Mark the space the ride occupies while moving, then add boarding, queuing and maintenance access. A machine’s base dimensions alone will underestimate the space you need.
Mark entrances, paths, existing structures and power connections. For indoor venues, include columns and the clear height below beams. Record the narrowest point on the delivery route.
Sketch the queue on your busiest day. Leave a clear path past the entrance for people walking through, and show where riders rejoin their group after exiting.
Measure door openings, turns in the delivery route and clearance below beams or ducts. Compare these measurements with the shipping dimensions and the assembled ride drawing.
Mark the future ride area on the first layout. Keep a delivery route to it and check how its queue would affect the attractions already in use.
Ask for the packing list and installation drawings for your model. Agree with the supplier who will receive the shipment, arrange unloading and check that the site is ready.
Request the current model manual, training records, maintenance schedule and parts contact. Confirm who will keep inspection records and how operators should report a fault.
Match crate labels and quantities against the packing list. Photograph any visible damage and record missing items with the carrier and supplier before unpacking.
Use the inspection intervals in the manual for your model. Record the date, equipment ID, findings, work completed and the person responsible for each entry.
Send the model and serial number, the part reference from the manual and a clear photo. Include the quantity required so the supplier can confirm the correct replacement.