Start with a plan for the exact model
Send the supplier a measured site plan showing the boundary, entrances, nearby buildings and known underground services. Ask for the layout drawing for the wheel you ordered, with its model number and revision date. Have your project engineer compare the drawing with the site before committing to groundworks. Mark the boarding platform, queue, exit and maintenance access so the team can see how the wheel will fit into the park.
Trace the delivery route from the road to the site
A truck may fit through the park gate and still be unable to turn at the next corner. Request the dimensions and weights of the largest shipping pieces. Walk the proposed route with the logistics contractor, noting gate widths, overhead obstructions and places where visitors cross. Agree on an unloading area and a place to store components before booking transport.
Agree who supplies each document and service
Ask the supplier which drawings, electrical requirements and installation documents come with the order. Record who will arrange site preparation, unloading, specialist installation, inspection and operator training. Check with the local authority which approvals and qualifications apply to your site, who can submit the documents and when they must be submitted.
Confirm readiness before booking the installation team
Keep a shared list with a named contact, due date and outstanding decision for each item. If the access route changes or a drawing is revised, send the update to the supplier and the site team. Set the installation date once both teams have reviewed the current documents and confirmed their part of the work.